{"id":465981,"date":"2018-10-22T04:56:17","date_gmt":"2018-10-22T04:56:17","guid":{"rendered":"https:\/\/www.h-eparts.com\/?post_type=white-papers&#038;p=465981"},"modified":"2018-10-22T05:53:36","modified_gmt":"2018-10-22T05:53:36","slug":"mp1000-counterweight-assembly-repair-upgrade","status":"publish","type":"white-papers","link":"https:\/\/www.h-eparts.com\/es\/white-papers\/mp1000-counterweight-assembly-repair-upgrade\/","title":{"rendered":"MP1000 Counterweight Assembly Repair \/ Upgrade"},"content":{"rendered":"<p>At a Western Australian gold mine the customer had\u00a0an ongoing issue with the counterweight assemblies\u00a0within their MP1000 crushers, not lasting to scheduled\u00a0manganese liner change-outs. This was attributed\u00a0to the top guard wearing through, causing excessive\u00a0wear to the counterweight sub-assembly. The\u00a0counterweight then became unbalanced, leading to\u00a0excessive vibrations within the crusher. Our client was\u00a0then forced into shutdown mode on a breakdown\u00a0basis to get the counterweight assembly immediately\u00a0changed out.\u00a0In addition to the repair and static rebalancing of\u00a0the counterweight; H-E Parts recommended that\u00a0the customer have both the top guard and outer\u00a0guard manufactured with H-E Parts Protech\u2122 PT-650 wear plate, which has superior wear and impact\u00a0resistance in comparison to the original 400 Brinell\u00a0Q&amp;T plate. In consultation with H-E Parts in-house\u00a0engineering department, our off-site repairs team\u00a0then custom-fabricated and installed the PT-650 fitted\u00a0counterweight guards at our Perth facility.<\/p>\n<p>Since the first MP1000 counterweight fitted with PT-650 guards were put into service, the plant availability\u00a0was greatly increased as a result of the counterweight\u00a0life performing well past scheduled shutdowns; up\u00a0to 12 months. The counterweight repair cost was\u00a0reduced by more than 50% through protection of the\u00a0counterweight assembly. Additionally, the crusher was\u00a0protected from damage or wear to the immediate\u00a0bushing and eccentric assemblies.<\/p>\n","protected":false},"excerpt":{"rendered":"At a Western Australian gold mine the customer had\u00a0an ongoing issue with the counterweight assemblies\u00a0within their MP1000 crushers, not lasting [&hellip;]","protected":false},"featured_media":465978,"template":"","tags":[],"class_list":["post-465981","white-papers","type-white-papers","status-publish","has-post-thumbnail","hentry"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.9 - aioseo.com -->\n\t<meta name=\"description\" content=\"At a Western Australian gold mine the customer had an ongoing issue with the counterweight assemblies within their MP1000 crushers, not lasting to scheduled manganese liner change-outs. This was attributed to the top guard wearing through, causing excessive wear to the counterweight sub-assembly. The counterweight then became unbalanced, leading to excessive vibrations within the crusher. Our client was then forced into shutdown mode\" \/>\n\t<meta name=\"robots\" content=\"max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n\t<meta name=\"google-site-verification\" content=\"ByvZnI2CWaTDYUoQgxV7hkZagTDgLMCc3EfzI8wEyOk\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.h-eparts.com\/es\/white-papers\/mp1000-counterweight-assembly-repair-upgrade\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.9\" \/>\n\t\t<meta property=\"og:locale\" content=\"es_ES\" \/>\n\t\t<meta property=\"og:site_name\" content=\"H-E Parts\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"MP1000 Counterweight Assembly Repair \/ Upgrade | H-E Parts\" \/>\n\t\t<meta property=\"og:description\" content=\"At a Western Australian gold mine the customer had an ongoing issue with the counterweight assemblies within their MP1000 crushers, not lasting to scheduled manganese liner change-outs. This was attributed to the top guard wearing through, causing excessive wear to the counterweight sub-assembly. The counterweight then became unbalanced, leading to excessive vibrations within the crusher. Our client was then forced into shutdown mode\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.h-eparts.com\/es\/white-papers\/mp1000-counterweight-assembly-repair-upgrade\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.h-eparts.com\/wp-content\/uploads\/2018\/10\/MP1000-counterweight-fab-with-MC3.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.h-eparts.com\/wp-content\/uploads\/2018\/10\/MP1000-counterweight-fab-with-MC3.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"4320\" \/>\n\t\t<meta property=\"og:image:height\" content=\"3240\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2018-10-22T04:56:17+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2018-10-22T05:53:36+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/hepartsinternational\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"MP1000 Counterweight Assembly Repair \/ Upgrade | H-E Parts\" \/>\n\t\t<meta name=\"twitter:description\" content=\"At a Western Australian gold mine the customer had an ongoing issue with the counterweight assemblies within their MP1000 crushers, not lasting to scheduled manganese liner change-outs. This was attributed to the top guard wearing through, causing excessive wear to the counterweight sub-assembly. The counterweight then became unbalanced, leading to excessive vibrations within the crusher. Our client was then forced into shutdown mode\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.h-eparts.com\/wp-content\/uploads\/2018\/10\/MP1000-counterweight-fab-with-MC3.jpg\" \/>\n\t\t<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.h-eparts.com\\\/es\\\/white-papers\\\/mp1000-counterweight-assembly-repair-upgrade\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.h-eparts.com\\\/es\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.h-eparts.com\\\/es\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.h-eparts.com\\\/es\\\/white-papers\\\/#listItem\",\"name\":\"White Papers\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.h-eparts.com\\\/es\\\/white-papers\\\/#listItem\",\"position\":2,\"name\":\"White Papers\",\"item\":\"https:\\\/\\\/www.h-eparts.com\\\/es\\\/white-papers\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.h-eparts.com\\\/es\\\/white-papers\\\/mp1000-counterweight-assembly-repair-upgrade\\\/#listItem\",\"name\":\"MP1000 Counterweight Assembly Repair \\\/ Upgrade\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.h-eparts.com\\\/es\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.h-eparts.com\\\/es\\\/white-papers\\\/mp1000-counterweight-assembly-repair-upgrade\\\/#listItem\",\"position\":3,\"name\":\"MP1000 Counterweight Assembly Repair \\\/ Upgrade\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.h-eparts.com\\\/es\\\/white-papers\\\/#listItem\",\"name\":\"White Papers\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.h-eparts.com\\\/es\\\/#organization\",\"name\":\"H-E Parts International\",\"url\":\"https:\\\/\\\/www.h-eparts.com\\\/es\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.h-eparts.com\\\/wp-content\\\/uploads\\\/2019\\\/01\\\/HEPI_General.png\",\"@id\":\"https:\\\/\\\/www.h-eparts.com\\\/es\\\/white-papers\\\/mp1000-counterweight-assembly-repair-upgrade\\\/#organizationLogo\",\"width\":938,\"height\":214,\"caption\":\"H-E Parts International Logo with no background\"},\"image\":{\"@id\":\"https:\\\/\\\/www.h-eparts.com\\\/es\\\/white-papers\\\/mp1000-counterweight-assembly-repair-upgrade\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/hepartsinternational\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/h-epartsinternational\\\/\"]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.h-eparts.com\\\/es\\\/white-papers\\\/mp1000-counterweight-assembly-repair-upgrade\\\/#webpage\",\"url\":\"https:\\\/\\\/www.h-eparts.com\\\/es\\\/white-papers\\\/mp1000-counterweight-assembly-repair-upgrade\\\/\",\"name\":\"MP1000 Counterweight Assembly Repair \\\/ Upgrade | H-E Parts\",\"description\":\"At a Western Australian gold mine the customer had an ongoing issue with the counterweight assemblies within their MP1000 crushers, not lasting to scheduled manganese liner change-outs. This was attributed to the top guard wearing through, causing excessive wear to the counterweight sub-assembly. The counterweight then became unbalanced, leading to excessive vibrations within the crusher. Our client was then forced into shutdown mode\",\"inLanguage\":\"es-ES\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.h-eparts.com\\\/es\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.h-eparts.com\\\/es\\\/white-papers\\\/mp1000-counterweight-assembly-repair-upgrade\\\/#breadcrumblist\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.h-eparts.com\\\/wp-content\\\/uploads\\\/2018\\\/10\\\/MP1000-counterweight-fab-with-MC3.jpg\",\"@id\":\"https:\\\/\\\/www.h-eparts.com\\\/es\\\/white-papers\\\/mp1000-counterweight-assembly-repair-upgrade\\\/#mainImage\",\"width\":4320,\"height\":3240,\"caption\":\"MP1000 counterweight fab with MC3 wear material\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.h-eparts.com\\\/es\\\/white-papers\\\/mp1000-counterweight-assembly-repair-upgrade\\\/#mainImage\"},\"datePublished\":\"2018-10-22T04:56:17+08:00\",\"dateModified\":\"2018-10-22T05:53:36+08:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.h-eparts.com\\\/es\\\/#website\",\"url\":\"https:\\\/\\\/www.h-eparts.com\\\/es\\\/\",\"name\":\"H-E Parts International\",\"inLanguage\":\"es-ES\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.h-eparts.com\\\/es\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>MP1000 Counterweight Assembly Repair \/ Upgrade | H-E Parts<\/title>\n\n","aioseo_head_json":{"title":"MP1000 Counterweight Assembly Repair \/ Upgrade | H-E Parts","description":"At a Western Australian gold mine the customer had an ongoing issue with the counterweight assemblies within their MP1000 crushers, not lasting to scheduled manganese liner change-outs. This was attributed to the top guard wearing through, causing excessive wear to the counterweight sub-assembly. The counterweight then became unbalanced, leading to excessive vibrations within the crusher. Our client was then forced into shutdown mode","canonical_url":"https:\/\/www.h-eparts.com\/es\/white-papers\/mp1000-counterweight-assembly-repair-upgrade\/","robots":"max-snippet:-1, max-image-preview:large, max-video-preview:-1","keywords":"","webmasterTools":{"google-site-verification":"ByvZnI2CWaTDYUoQgxV7hkZagTDgLMCc3EfzI8wEyOk","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BreadcrumbList","@id":"https:\/\/www.h-eparts.com\/es\/white-papers\/mp1000-counterweight-assembly-repair-upgrade\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.h-eparts.com\/es\/#listItem","position":1,"name":"Home","item":"https:\/\/www.h-eparts.com\/es\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.h-eparts.com\/es\/white-papers\/#listItem","name":"White Papers"}},{"@type":"ListItem","@id":"https:\/\/www.h-eparts.com\/es\/white-papers\/#listItem","position":2,"name":"White Papers","item":"https:\/\/www.h-eparts.com\/es\/white-papers\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.h-eparts.com\/es\/white-papers\/mp1000-counterweight-assembly-repair-upgrade\/#listItem","name":"MP1000 Counterweight Assembly Repair \/ Upgrade"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.h-eparts.com\/es\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.h-eparts.com\/es\/white-papers\/mp1000-counterweight-assembly-repair-upgrade\/#listItem","position":3,"name":"MP1000 Counterweight Assembly Repair \/ Upgrade","previousItem":{"@type":"ListItem","@id":"https:\/\/www.h-eparts.com\/es\/white-papers\/#listItem","name":"White Papers"}}]},{"@type":"Organization","@id":"https:\/\/www.h-eparts.com\/es\/#organization","name":"H-E Parts International","url":"https:\/\/www.h-eparts.com\/es\/","logo":{"@type":"ImageObject","url":"https:\/\/www.h-eparts.com\/wp-content\/uploads\/2019\/01\/HEPI_General.png","@id":"https:\/\/www.h-eparts.com\/es\/white-papers\/mp1000-counterweight-assembly-repair-upgrade\/#organizationLogo","width":938,"height":214,"caption":"H-E Parts International Logo with no background"},"image":{"@id":"https:\/\/www.h-eparts.com\/es\/white-papers\/mp1000-counterweight-assembly-repair-upgrade\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/hepartsinternational","https:\/\/www.linkedin.com\/company\/h-epartsinternational\/"]},{"@type":"WebPage","@id":"https:\/\/www.h-eparts.com\/es\/white-papers\/mp1000-counterweight-assembly-repair-upgrade\/#webpage","url":"https:\/\/www.h-eparts.com\/es\/white-papers\/mp1000-counterweight-assembly-repair-upgrade\/","name":"MP1000 Counterweight Assembly Repair \/ Upgrade | H-E Parts","description":"At a Western Australian gold mine the customer had an ongoing issue with the counterweight assemblies within their MP1000 crushers, not lasting to scheduled manganese liner change-outs. This was attributed to the top guard wearing through, causing excessive wear to the counterweight sub-assembly. The counterweight then became unbalanced, leading to excessive vibrations within the crusher. Our client was then forced into shutdown mode","inLanguage":"es-ES","isPartOf":{"@id":"https:\/\/www.h-eparts.com\/es\/#website"},"breadcrumb":{"@id":"https:\/\/www.h-eparts.com\/es\/white-papers\/mp1000-counterweight-assembly-repair-upgrade\/#breadcrumblist"},"image":{"@type":"ImageObject","url":"https:\/\/www.h-eparts.com\/wp-content\/uploads\/2018\/10\/MP1000-counterweight-fab-with-MC3.jpg","@id":"https:\/\/www.h-eparts.com\/es\/white-papers\/mp1000-counterweight-assembly-repair-upgrade\/#mainImage","width":4320,"height":3240,"caption":"MP1000 counterweight fab with MC3 wear material"},"primaryImageOfPage":{"@id":"https:\/\/www.h-eparts.com\/es\/white-papers\/mp1000-counterweight-assembly-repair-upgrade\/#mainImage"},"datePublished":"2018-10-22T04:56:17+08:00","dateModified":"2018-10-22T05:53:36+08:00"},{"@type":"WebSite","@id":"https:\/\/www.h-eparts.com\/es\/#website","url":"https:\/\/www.h-eparts.com\/es\/","name":"H-E Parts International","inLanguage":"es-ES","publisher":{"@id":"https:\/\/www.h-eparts.com\/es\/#organization"}}]},"og:locale":"es_ES","og:site_name":"H-E Parts","og:type":"article","og:title":"MP1000 Counterweight Assembly Repair \/ Upgrade | H-E Parts","og:description":"At a Western Australian gold mine the customer had an ongoing issue with the counterweight assemblies within their MP1000 crushers, not lasting to scheduled manganese liner change-outs. This was attributed to the top guard wearing through, causing excessive wear to the counterweight sub-assembly. The counterweight then became unbalanced, leading to excessive vibrations within the crusher. Our client was then forced into shutdown mode","og:url":"https:\/\/www.h-eparts.com\/es\/white-papers\/mp1000-counterweight-assembly-repair-upgrade\/","og:image":"https:\/\/www.h-eparts.com\/wp-content\/uploads\/2018\/10\/MP1000-counterweight-fab-with-MC3.jpg","og:image:secure_url":"https:\/\/www.h-eparts.com\/wp-content\/uploads\/2018\/10\/MP1000-counterweight-fab-with-MC3.jpg","og:image:width":4320,"og:image:height":3240,"article:published_time":"2018-10-22T04:56:17+00:00","article:modified_time":"2018-10-22T05:53:36+00:00","article:publisher":"https:\/\/www.facebook.com\/hepartsinternational","twitter:card":"summary_large_image","twitter:title":"MP1000 Counterweight Assembly Repair \/ Upgrade | H-E Parts","twitter:description":"At a Western Australian gold mine the customer had an ongoing issue with the counterweight assemblies within their MP1000 crushers, not lasting to scheduled manganese liner change-outs. This was attributed to the top guard wearing through, causing excessive wear to the counterweight sub-assembly. The counterweight then became unbalanced, leading to excessive vibrations within the crusher. Our client was then forced into shutdown mode","twitter:image":"https:\/\/www.h-eparts.com\/wp-content\/uploads\/2018\/10\/MP1000-counterweight-fab-with-MC3.jpg","twitter:label1":"Est. reading time","twitter:data1":"1 minute"},"aioseo_meta_data":{"post_id":"465981","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"MP1000"}},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"featured","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":true,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2025-11-17 21:51:03","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2024-01-23 20:05:11","updated":"2025-11-17 21:51:03"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.h-eparts.com\/es\/\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.h-eparts.com\/es\/white-papers\/\" title=\"White Papers\">White Papers<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tMP1000 Counterweight Assembly Repair \/ Upgrade\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.h-eparts.com\/es\/"},{"label":"White Papers","link":"https:\/\/www.h-eparts.com\/es\/white-papers\/"},{"label":"MP1000 Counterweight Assembly Repair \/ Upgrade","link":"https:\/\/www.h-eparts.com\/es\/white-papers\/mp1000-counterweight-assembly-repair-upgrade\/"}],"_links":{"self":[{"href":"https:\/\/www.h-eparts.com\/es\/wp-json\/wp\/v2\/white-papers\/465981","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.h-eparts.com\/es\/wp-json\/wp\/v2\/white-papers"}],"about":[{"href":"https:\/\/www.h-eparts.com\/es\/wp-json\/wp\/v2\/types\/white-papers"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.h-eparts.com\/es\/wp-json\/wp\/v2\/media\/465978"}],"wp:attachment":[{"href":"https:\/\/www.h-eparts.com\/es\/wp-json\/wp\/v2\/media?parent=465981"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.h-eparts.com\/es\/wp-json\/wp\/v2\/tags?post=465981"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}