{"id":1193060,"date":"2019-08-06T04:07:37","date_gmt":"2019-08-06T04:07:37","guid":{"rendered":"https:\/\/www.h-eparts.com\/?post_type=white-papers&#038;p=1193060"},"modified":"2019-08-08T03:56:46","modified_gmt":"2019-08-08T03:56:46","slug":"timely-supply-to-meet-maintenance-demands","status":"publish","type":"white-papers","link":"https:\/\/www.h-eparts.com\/es\/white-papers\/timely-supply-to-meet-maintenance-demands\/","title":{"rendered":"TIMELY SUPPLY TO MEET MAINTENANCE DEMANDS"},"content":{"rendered":"\n<p>A major issue in the mining industry is downtime and the costs associated with it. At H-E Parts, we understand that your equipment needs to return to operation as quickly as possible which is why at H-E Parts we place high priority on asset availability and communication with customers. <\/p>\n\n\n\n<p>A customer and their sister company were carrying out Caterpillar 24H\/M Grader rebuilds at the same time. As the two sites share one service exchange H-frame components between them this was an issue for the customer and they approached H-E Parts in hope of a timely solution. <\/p>\n\n\n\n<p>H-E Parts ability to manage complete drivetrain solutions meant a H frame was in stock and available with two final drives, four brake assemblies, a differential and the mounting kit required to get the equipment back up and operational in a timely manner as requested by the customer. As H-E Parts are equipped to manage the full drivetrain, our COR Cooling\u2122 division also reconditioned the customers radiator at the same time. Due to the costs associated with transporting the completely assembled frame, H-E Parts worked with the customer to ensure the frame was only partly assembled to reduce costs associated with wide load transport. <\/p>\n\n\n\n<p>The supplied 24H\/M frame saved the customer approximately 100 labor hours during the machine rebuild process, which ensured it was returned to operation sooner.   <\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/d1dgioomm9x0li.cloudfront.net\/wp-content\/uploads\/2019\/08\/H24-Frame-1-1024x768.jpg\" alt=\"\" class=\"wp-image-1193063\" srcset=\"https:\/\/www.h-eparts.com\/wp-content\/uploads\/2019\/08\/H24-Frame-1-1024x768.jpg 1024w, https:\/\/www.h-eparts.com\/wp-content\/uploads\/2019\/08\/H24-Frame-1-300x225.jpg 300w, https:\/\/www.h-eparts.com\/wp-content\/uploads\/2019\/08\/H24-Frame-1-768x576.jpg 768w, https:\/\/www.h-eparts.com\/wp-content\/uploads\/2019\/08\/H24-Frame-1.jpg 1632w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"A major issue in the mining industry is downtime and the costs associated with it. At H-E Parts, we understand [&hellip;]","protected":false},"featured_media":1193062,"template":"","tags":[],"class_list":["post-1193060","white-papers","type-white-papers","status-publish","has-post-thumbnail","hentry"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.h-eparts.com\/es\/wp-json\/wp\/v2\/white-papers\/1193060","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.h-eparts.com\/es\/wp-json\/wp\/v2\/white-papers"}],"about":[{"href":"https:\/\/www.h-eparts.com\/es\/wp-json\/wp\/v2\/types\/white-papers"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.h-eparts.com\/es\/wp-json\/wp\/v2\/media\/1193062"}],"wp:attachment":[{"href":"https:\/\/www.h-eparts.com\/es\/wp-json\/wp\/v2\/media?parent=1193060"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.h-eparts.com\/es\/wp-json\/wp\/v2\/tags?post=1193060"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}