{"id":1205104,"date":"2019-12-04T01:16:27","date_gmt":"2019-12-04T01:16:27","guid":{"rendered":""},"modified":"2019-12-04T01:17:12","modified_gmt":"2019-12-04T01:17:12","slug":"national-glencore-contract-awarded-to-h-e-parts","status":"publish","type":"news","link":"https:\/\/www.h-eparts.com\/es\/news\/national-glencore-contract-awarded-to-h-e-parts\/","title":{"rendered":"National Glencore Contract Awarded to H-E Parts"},"content":{"rendered":"\n<p>H-E Parts announced today that they have been awarded a 1-year supply agreement with <a href=\"https:\/\/www.glencore.com.au\/en\/media-centre\/Pages\/latest-news.aspx\">Glencore<\/a> Coal Assets Australia Pty Ltd (Glencore), which incorporates the supply and overhaul of new and service exchanged radiators for Glencore\u2019s mobile equipment fleets across 24 mine sites in Australia. The contract has the provision for a further 12-month extension based on performance and includes all ancillary mining equipment as well as prime production mining truck, excavator and drill rig fleets.<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"alignright\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/d1dgioomm9x0li.cloudfront.net\/wp-content\/uploads\/2019\/09\/IMG_0265-1024x768.jpg\" alt=\"H-E Parts Radiator recore\" class=\"wp-image-1193505\" srcset=\"https:\/\/www.h-eparts.com\/wp-content\/uploads\/2019\/09\/IMG_0265-1024x768.jpg 1024w, https:\/\/www.h-eparts.com\/wp-content\/uploads\/2019\/09\/IMG_0265-300x225.jpg 300w, https:\/\/www.h-eparts.com\/wp-content\/uploads\/2019\/09\/IMG_0265-768x576.jpg 768w, https:\/\/www.h-eparts.com\/wp-content\/uploads\/2019\/09\/IMG_0265-600x450.jpg 600w, https:\/\/www.h-eparts.com\/wp-content\/uploads\/2019\/09\/IMG_0265.jpg 2016w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure><\/div>\n\n\n\n<p>The contract will be managed by H-E Parts Mining\nSolutions Cooling Division branches and incorporates various styles of\nindependent radiators and complete modular nose cones which include the\nradiator, fan and motor and charge air cooler as a complete assembly. The\ncomplete range of COR Cooling\u2122 products are designed to provide extended service\nintervals, improved performance and increased productivity, whilst reducing\nequipment downtime and associated life cycle costs.<\/p>\n\n\n\n<p>Ashley Hams, Mining Solutions Vice President\nstated that \u201cThrough historic and ongoing service delivery as well as continuous\nproduct engineering innovation, our COR Cooling\u2122 product and service lines have\nadvanced to be a market leader\u201d. Hams further commented that \u201cthe ability to\nsupply application specific cooling systems to our mining and industrial\ncustomers working in some of the toughest conditions in the world, had\ndemonstrated the engineering and quality prowess that H-E Parts has become\nsynonymous with.\u201d<\/p>\n\n\n\n<p>H-E Parts capability to provide innovative\nsolutions and utilize specialized proprietary modelling software throughout its\nproduct development process, has allowed H-E Parts to provide customers with\nproducts that integrate enhanced cooling efficiencies and increased service\nperformance value into their equipment.<\/p>\n\n\n\n<p>H-E\nParts manufactures and supplies high quality, innovative products that can also\nbe tailored to our customers\u2019 specific requirements. H-E Parts in-house\nengineering, product and service offerings, guarantee we can support customers\nthroughout the full product life cycle while working to award the end user with\nthe lowest total cost of ownership for their operation.<\/p>\n\n\n\n<p>H-E Parts believes that the partnership of the proven COR Cooling\u2122 product line, combined with in-house engineering and service support, will provide a flexible, cost-effective, long-term solution for Glencore and look forward to a mutually beneficial relationship.<\/p>\n","protected":false},"excerpt":{"rendered":"H-E Parts announced today that they have been awarded a 1-year supply agreement with Glencore Coal Assets Australia Pty Ltd [&hellip;]","protected":false},"featured_media":1193505,"template":"","tags":[],"class_list":["post-1205104","news","type-news","status-publish","has-post-thumbnail","hentry"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.h-eparts.com\/es\/wp-json\/wp\/v2\/news\/1205104","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.h-eparts.com\/es\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/www.h-eparts.com\/es\/wp-json\/wp\/v2\/types\/news"}],"version-history":[{"count":2,"href":"https:\/\/www.h-eparts.com\/es\/wp-json\/wp\/v2\/news\/1205104\/revisions"}],"predecessor-version":[{"id":1205106,"href":"https:\/\/www.h-eparts.com\/es\/wp-json\/wp\/v2\/news\/1205104\/revisions\/1205106"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.h-eparts.com\/es\/wp-json\/wp\/v2\/media\/1193505"}],"wp:attachment":[{"href":"https:\/\/www.h-eparts.com\/es\/wp-json\/wp\/v2\/media?parent=1205104"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.h-eparts.com\/es\/wp-json\/wp\/v2\/tags?post=1205104"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}