{"id":1192826,"date":"2019-07-23T04:03:49","date_gmt":"2019-07-23T04:03:49","guid":{"rendered":"https:\/\/www.h-eparts.com\/?post_type=news&#038;p=1192826"},"modified":"2019-07-24T01:52:21","modified_gmt":"2019-07-24T01:52:21","slug":"h-e-parts-grand-opening-regency-park-adelaide","status":"publish","type":"news","link":"https:\/\/www.h-eparts.com\/es\/news\/h-e-parts-grand-opening-regency-park-adelaide\/","title":{"rendered":"H-E Parts grand opening, Regency park, South Australia."},"content":{"rendered":"\n<p>H-E Parts\ncelebrated the grand opening of the newly built offices in Regency Park, South\nAustralia with an event held in July 2019. The evening was celebrated by both\nMining Solutions and H-E Parts COR Cooling divisions employees and their\nfamilies, allowing the opportunity for all attendees to take a tour through the\nbuilding and workshop. Food and refreshments were provided and the official\nribbon cutting was conducted by Ian Olivieri, Director of H-E Parts Australia.\nSpeeches were heard from Ian and Ashley Hams, General Manager of Mining\nSolutions Australia. Engineer and long-term staff member, Peter French, was\npresented with a gift in recognition of his extensive efforts throughout the\nrebuild, including his involvement in the design, management of contract work\nand temporary relocation of staff. <\/p>\n\n\n\n<ul class=\"wp-block-gallery aligncenter columns-2 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\"><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/d1dgioomm9x0li.cloudfront.net\/wp-content\/uploads\/2019\/07\/Grand-Opening-Photo-1024x576.jpg\" alt=\"\" data-id=\"1192827\" data-link=\"https:\/\/www.h-eparts.com\/?attachment_id=1192827\" class=\"wp-image-1192827\" srcset=\"https:\/\/www.h-eparts.com\/wp-content\/uploads\/2019\/07\/Grand-Opening-Photo-1024x576.jpg 1024w, https:\/\/www.h-eparts.com\/wp-content\/uploads\/2019\/07\/Grand-Opening-Photo-300x169.jpg 300w, https:\/\/www.h-eparts.com\/wp-content\/uploads\/2019\/07\/Grand-Opening-Photo-768x432.jpg 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>Team members and their families gather in front of the newly built office in Regency park, Adelaide for the ribbon cutting ceremony. <\/figcaption><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/d1dgioomm9x0li.cloudfront.net\/wp-content\/uploads\/2019\/07\/Ribbon-Cutting-2-1024x768.jpeg\" alt=\"\" data-id=\"1192828\" data-link=\"https:\/\/www.h-eparts.com\/?attachment_id=1192828\" class=\"wp-image-1192828\" srcset=\"https:\/\/www.h-eparts.com\/wp-content\/uploads\/2019\/07\/Ribbon-Cutting-2-1024x768.jpeg 1024w, https:\/\/www.h-eparts.com\/wp-content\/uploads\/2019\/07\/Ribbon-Cutting-2-300x225.jpeg 300w, https:\/\/www.h-eparts.com\/wp-content\/uploads\/2019\/07\/Ribbon-Cutting-2-768x576.jpeg 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>The ribbon cutting ceremony performed by Simon Hall &#8211; Central Operations Manager, Ashley Hams &#8211; General Manager of H-E Parts Mining Solutions and Ian Olivieri &#8211; Director of  H-E Parts Australia.<\/figcaption><\/figure><\/li><\/ul>\n\n\n\n<p>Office staff were relocated to temporary offices next-door when construction began in December. The work was completed ahead of schedule, allowing staff to move into the new building in May. With a second level added, the facility has now almost doubled in size, with many visitors giving compliments on the space and modern design. Ashley Hams stated \u201cthe new building increases our professionalism and our capacity to employ people to support the business as it grows.&#8221;<\/p>\n","protected":false},"excerpt":{"rendered":"H-E Parts celebrated the grand opening of the newly built offices in Regency Park, South Australia with an event held [&hellip;]","protected":false},"featured_media":1192829,"template":"","tags":[],"class_list":["post-1192826","news","type-news","status-publish","has-post-thumbnail","hentry"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.h-eparts.com\/es\/wp-json\/wp\/v2\/news\/1192826","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.h-eparts.com\/es\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/www.h-eparts.com\/es\/wp-json\/wp\/v2\/types\/news"}],"version-history":[{"count":11,"href":"https:\/\/www.h-eparts.com\/es\/wp-json\/wp\/v2\/news\/1192826\/revisions"}],"predecessor-version":[{"id":1192843,"href":"https:\/\/www.h-eparts.com\/es\/wp-json\/wp\/v2\/news\/1192826\/revisions\/1192843"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.h-eparts.com\/es\/wp-json\/wp\/v2\/media\/1192829"}],"wp:attachment":[{"href":"https:\/\/www.h-eparts.com\/es\/wp-json\/wp\/v2\/media?parent=1192826"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.h-eparts.com\/es\/wp-json\/wp\/v2\/tags?post=1192826"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}